Jobs Bidding
In order to be considered ALL Subcontractor & Suppler Quotations must be in our office no later than 1 hour prior to bid time.
Estimating Fax: 910-353-3073
Estimating Email: milfedestimating@earthlink.net
If you email your quote, please also fax a copy to ensure that we receive.
Specification Guide for all North Carolina MACC Projects
Specification Guide Updated Spec Section 02 82 16 dated 3/10/10
Currrent Davis Bacon Wages "Building" for MCB Camp LeJeune, N.C.
Current Davis Bacon Wages "HIGHWAY" for MCB Camp LeJeune, N.C.
Current Davis Bacon Wages "Building" for MCAS Cherry Point, N.C.
Current Davis Bacon Wages "HIGHWAY" for MCAS Cherry Point, N.C.
** Subcontractors & suppliers must acknowledge all
AMENDMENTS / ADDENDA in order for your quotation to be considered **
JOB NO# |
DATE |
TIME |
TITLE & LOCATION |
DRAWINGS |
AMENDS |
| W912QR-11-R-0051 |
2-6-12 |
1:00 pm |
Army Reserve Center, Panama City, FL (Design/Build) |
The following files are LARGE. Please download to your computer using the Save Target As feature For Native Files (Zip) please go to www.proconstructinc.com Time of Completion 490 Days |
|
N69450-12-R-1758 - P442 |
2-8-12 Changed with Amend 4 |
1:00 pm |
Verticle Landing Pads MCAS Beaufort, SC |
The following files are LARGE. Please download to your computer using the Save Target As feature Time of Completion 555 Days |
|
| 4927652 | 2-10-12 |
1:00 pm |
Construct Fire Training Tower MCAS Cherry Point, NC |
||
| 11-0174 | 2-15-12 |
1:00 pm |
Redesign Drainage Culverts, Robert Wilson Blvd. MCB Camp Lejeune, NC |
||
| 12-0047 | 2-28-12 |
1:00 pm |
P1285 SOF Armory Facility Expansion MCB Camp Lejeune, NC |
SUBCONTRACTOR & SUPPLIER QUOTATIONS MUST BE VALID FOR 120 DAYS IN ORDER TO BE CONSIDERED Time of Completion 480 Days |
|
| 11-0168 | 2-29-12 |
12:00 pm |
Repair Elevated Potable Water Storage Tank, STC510 MCAS Cherry Point, NC |
||
| 11-0156 | 2-29-12 |
1:00 pm |
Q-419 Addition to HM2 Charles "Luke" Milam Aid Station MCB Camp Lejeune, NC |
1/2 SCALE DRAWINGS Full Scale Drawings SUBCONTRACTOR & SUPPLIER QUOTATIONS MUST BE VALID FOR 120 DAYS IN ORDER TO BE CONSIDERED Time of Completion 365 Days |
|
| BE0921R | 2-29-12 |
3:00 pm | Construct CBRNE Warehouse MCAS Beaufort, SC |
Drawings Time of Completion 300 Days |
|
| 120056 | 3-5-12 |
12:00 pm |
Construct SOF SATS Pad MARSOC MCB Camp Lejeune, NC |
||
| 4381979/CP1307M | 3-5-12 |
1:00 pm |
Repair Steam Cathodic Protection System MCAS Cherry Point, NC |
Jobs Waiting to be Awarded
JOB NO# |
DATE |
TIME |
TITLE & LOCATION |
DRAWINGS |
AMENDS |
| 11-0098 | 9-1-11 |
10:00 am |
Turning Lane Improvements Holcomb Bldg Camp Lejeune, NC |
||
| 09-0170 | 9-1-11 |
11:00 am |
Building Repairs AS-3502 MCB Camp Lejeune |
Time of Completion 360 days This is a FY 11/12 Straddle Project. Proposals must be valid for 180 days. |
|
| 11-0029 | 9-13-11 |
12:00 pm |
Repair Street Parking Lots H through O MCB Camp Lejeune |
Time of Completion 540 Days This is an FY12 Straddle Project. Proposals must be valid for 120 Days |
|
| 11-0097 | REBID 9-16-11 Changed with Amend 9 |
8:00 am |
Repair Bridges Various Locations MCB Camp Lejeune |
This is a FY 11/12 Straddle Project. Proposals must be valid for 120 days. Time of Completion 120 Days |
|
| 5018058 | 9-19-11 Changed with Amend 1 |
1:00 pm |
Repair Raw Water Line from Well 14 (Bldg. 113) MCAS Cherry Point |
Time of Completion Base 160 Days Base Plus Additive 185 Days |
|
| 11-0117 | 9-19-11 |
1:00 pm |
Repair Applied Instruction Bldg. BB-50 MCB Camp Lejeune |
Time of Completion 330 Days This is a FY 11/12 Straddle Project. Proposals must be valid for 120 days. |
|
| 1108M | 9-22-11 Changed with Amend 1 |
1:00 pm |
Repairs at Central Heating Plant, Bldg. 152 MCAS Cherry Point |
Time of Completion 360 Days |
|
| 5334213 | 9-26-11 Changed with Amend 4 |
1:00 pm |
Reclaimed Water for Wastewater Treatment Plant B-4376 MCAS Cherry Point |
||
| W912QR-11-R-0076 |
10-19-11 |
3:00 pm |
Design/Build Construction of a Tactical Equipment Maintenance Facility (TEMF), Millington, TN |
Time of Completion 490 Days |
|
| BE1110M | 11-18-11 Changed with Amend 4 |
2:00 pm |
Repair Building 1064 MWSS-273 MCAS Beaufort, SC |
Drawings Time of Completion 300 Days
|
|
| 5784219 | 11-28-11 |
1:00 pm |
Repair & Microsurface Roads at MCAS Cherry Point, NC |
||
| NF313-08 (4998360) | 12-16-11 Changed with Amend 4 |
1:00 pm |
Construct Defuel/Refuel Area FRC East MCAS Cherry Point |
||
| 5622676 | Best & Final 12-22-11 Changed with Amend 4 |
1:00 pm |
Replace Two VFDS in Lift Station B-4259 MCAS Cherry Point |
||
| BE1852M | 1-18-12 Changed with Amend 1 |
1:00 pm |
Replace MCAS Beaufort Street Lighting MCAS Beaufort, SC |
||
| 6062017 | 1-25-12 |
1:00 pm |
Repair BEQ Walkway B-4310 MCAS Cherry Point |
Time of Completon 75 Days |
|
| 11-0079 | 1-25-12
Changed with Amend 1 |
2:00 pm |
Install Modular Buildings at Onslow Beach Phase VI Camp Leune |
Amend 3 Drawings |
|
| 5637825 | 1-26-12 Changed with Amend 3 |
1:00 pm |
Routine Pavement Repairs, Langley Road MCAS Cherry Point |
||
| 12-0411 | 2-2-12 |
12:00 pm |
Thermoplastic Crosswalks in French Creek MCB Camp Lejeune, NC |
||